Product features
Think of it as the first checkpoint in your pipeline: liquid enters the housing, hits the basket, and everything coarse – scale, weld beads, fibers, grit – stays behind the perforated wall while clean flow passes downstream. That single step takes the pounding instead of your cartridge filters, and cartridges are far more expensive to replace than an empty-and-reinstall basket.
Each basket starts as a stainless steel sheet, is punched with a sized hole pattern, rolled into a cylinder and seam-welded. The rim matters as much as the wall: ours is rolled heavy on purpose, so it seats flat against the housing face and nothing slips past the edge unfiltered.
Key numbers at a glance:
Holes 1 – 8 mm Mesh lining to 100 µm 304 / 316L Stainless Flat or Conical Bottom Side Ears + Lifting Bar
The two options solve different problems. Plain perforation between 1 mm and 8 mm moves a lot of flow with a low pressure drop – the right call for pump suction protection and intake lines where you are stopping chunks, not fines. When the process demands finer capture, we line the perforated wall with woven mesh and push the cut-off down to 100 microns; the perforated shell underneath still does the structural work, so the lining never carries load.
Not sure which side of the line your duty falls on? Tell us the particle you are trying to catch and the flow rate – we will tell you honestly whether perforation alone is enough.
A large share of what we ship are spares and replacements for baskets already in service, including fits for Hayward, Eaton and other common housing brands. No drawing needed to start: photograph the old basket or mail it to us, and we reproduce the fit – diameter, height, rim style, ears, lifting bar, hole spec, all of it.
Running a plant with multiple housings? We price maintenance-stock quantities on a volume basis so your spares shelf gets refilled without a procurement fight each time.
Send the housing size and how many baskets you need – that is the entire homework. Our engineers answer in plain language, not sales copy, and usually reply the same day. If your last supplier sent you baskets that rattled in the housing or a rim that never sat flush, mention it; fitting is exactly the part we are fussy about.
Round-hole perforation from 1 mm up to 8 mm. For finer duty, a woven mesh lining brings the cut-off down to 100 microns while the perforated wall keeps the strength.
Yes – that is a routine job here. Send a photo of the old basket or the basket itself; we reproduce diameter, height, rim, ears, lifting bar and hole pattern to match the fit.
Flat bottoms suit most horizontal housings and simple drop-in service. Conical bottoms help debris settle toward a drain point in vertical or bottom-drain housings. Tell us your housing orientation and we will recommend one.
Every basket is dimensionally checked against your housing dimensions before packing – diameter, height and rim seat are all verified, not assumed.
Stainless steel sheet as standard – 304 for general water and process duty, 316L where chlorides or food-grade washdowns are involved.
Yes. Volume pricing applies to spare-part orders, so plants running several housings can stock replacements economically.
